
Mexico City, Mexico
- State or region
- Regional location
- Technology
- GCOP
- Industry
- Broadcasting
Long-term Televisa chiller-optimization project documented by the original DLV website.
View case studyPreparing building intelligence…
Explore how DLV Energy technologies have been applied or evaluated across rooftop HVAC systems, chilled-water plants, healthcare facilities, retail environments, entertainment venues, industrial operations, and multi-site portfolios.
See How Results Are EvaluatedResults shown are specific to the identified equipment, facility, operating conditions, evaluation period, and measurement methodology. Results from one project do not guarantee results for another facility.
Company and facility names and logos remain the property of their respective owners and are referenced in connection with the applicable documented relationship.
Each project carries the strongest result classification supported by the available record without elevating reported values to verified results.
Broadcasting operations can require persistent cooling for technical and occupied spaces while maintaining reliable chilled-water service.
Review documented application Colombia · GCOPHealthcare manufacturing facilities may combine process requirements, production schedules, and significant chilled-water loads.
Review documented application Monterrey, Nuevo León, Mexico · RTU-SCCinema HVAC operation combines long occupied periods, variable audience loads, humidity considerations, and distributed rooftop equipment.
Review documented application Guadalajara, Jalisco, Mexico · GCOPRetail chilled-water loads vary by season, occupancy, weather, and trading schedules, requiring careful comparison of representative periods.
Review documented application New York City region, USA · GCOP + Controls IntegrationThe documented analysis covers modernization of chiller controls and associated building-system visibility in an operating healthcare environment.
Explore locations where DLV Energy technologies, pilots, assessments, controls strategies, or completed energy projects have been implemented.
Some map locations represent completed projects whose detailed case studies will be published in future website updates. Coordinates are regional display references, not exact customer addresses.
Showing 21 project locations

Long-term Televisa chiller-optimization project documented by the original DLV website.
View case studyDLV Energy’s project experience extends across several of Brazil’s most important commercial and industrial regions.
Whether you operate one building or a portfolio across multiple regions, DLV Energy can help assess qualifying rooftop units, chillers, controls, and energy-performance opportunities.
Showing 13 of 13 documented applications
The original DLV website documents a long-running GCOP application at Televisa Chapultepec supporting continuous broadcasting operations in Mexico City.
The original DLV website documents a GCOP-related chiller controls application at a Baxter pharmaceutical manufacturing facility in Colombia.
The original DLV website documents an October 2018 RTU-SC pilot involving 11 controls at Cinemex San Pedro in Monterrey.
DLV project records document seasonal GCOP evaluation at Liverpool Plaza del Sol. Multiple reported percentages cover different periods and remain presented separately.
A project analysis documents a proposed controls modernization and GCOP scope. Financial and energy values are treated as pre-installation projections, not completed savings.
Project documentation describes an active multi-site RTU-SC deployment with network, programming, sequencing, and training considerations. No final performance result is published.
Customer-supplied project information describes a June 2019 RTU-SC pilot at Sanborns followed by authorization for a larger nationwide deployment.
Customer-supplied project information describes a June 2019 GCOP pilot at Sanborns with reported energy and financial results.
Customer-supplied project information describes a GCOP pilot completed at Madrid’s Avenida de América bus interchange in March 2022.
Project information supplied by the website owner describes chilled-water supply-temperature control at London & Regional’s International Business Park offices in Panama.
Customer-supplied project information reports a capacity-based GCOP comparison at Calhoun Community College.
Project information supplied by the website owner describes a September 2023 GCOP proposal and preliminary financial model for Metro Services Group.
Customer-supplied project information describes a GCOP installation at Plaza Carso with reported energy and financial performance.
Cinema and healthcare-portfolio candidates document rooftop-unit pilot, controls, networking, sequencing, and evaluation requirements.
Explore RTU-SCBroadcasting, manufacturing, retail, and healthcare candidates document chilled-water optimization, Evaluation Mode, controls, and projected economics.
Explore GCOPHealthcare projects demonstrate why BMS architecture, BACnet interfaces, IT approval, programming, and commissioning matter.
Explore solutionsVERIFIED and MEASURED labels are reserved for approved records with a documented method. No current candidate meets the repository evidence threshold for public use of those labels.
| Project | Industry | Location | Technology | Equipment | Status | Measurement type | Published outcome |
|---|---|---|---|---|---|---|---|
| Televisa | Broadcasting | Mexico City, Mexico | GCOP | Central chilled-water application | LEGACY-DOCUMENTED PROJECT | Documentation incomplete | Long-term application reported |
| Baxter | Manufacturing | Colombia | GCOP | Chilled-water system | LEGACY-DOCUMENTED RESULT | Documentation incomplete | Above 20% reported |
| Cinemex | Entertainment | Monterrey, Nuevo León, Mexico | RTU-SC | Packaged rooftop HVAC units | DOCUMENTED PILOT RESULT | Documentation incomplete | Up to approximately 55% reported |
| Liverpool Plaza del Sol | Retail | Guadalajara, Jalisco, Mexico | GCOP | Chilled-water system | DOCUMENTED EVALUATION RESULT | Evaluation Mode reported | Near 10% reported |
Project results may use Evaluation Mode, direct power metering, capacity-based analysis, utility comparison, trends, weather review, or operational normalization. The method, data sources, periods, exclusions, and status must travel with every result.
Review Performance EvaluationStart with facility, equipment, controls, operating, and energy information. DLV Energy will help determine which assets merit engineering review and what evidence should guide the next decision.
| Healthcare |
| New York City region, USA |
| GCOP + Controls Integration |
| Four documented Trane CGAM chillers |
| PRELIMINARY FINANCIAL MODEL |
| Documentation incomplete |
| $35,000 |
| Multi-Site Healthcare Portfolio in New Mexico | Multi-Site Portfolio | New Mexico, USA | RTU-SC + Controls Integration | Approximately 47 rooftop units across four documented facilities | PROJECT IN PROGRESS | Documentation incomplete | Active project |
| Grupo Carso / Sanborns | Retail | Mexico | RTU-SC | Packaged rooftop HVAC units | CUSTOMER-REPORTED RESULT | Documentation incomplete | 39% reported |
| Grupo Carso / Sanborns | Retail | Mexico | GCOP | Central chilled-water system | CUSTOMER-REPORTED RESULT | Documentation incomplete | 15% reported |
| Avenida de América Bus Interchange | Transportation | Madrid, Spain | GCOP | Central chilled-water system | CUSTOMER-REPORTED RESULT | Documentation incomplete | 109,280 kWh/year reported |
| London & Regional Panama | Commercial offices | International Business Park, Panama | GCOP + Controls Integration | Central chilled-water system | LEGACY-DOCUMENTED PROJECT | Documentation incomplete | Completed controls application reported |
| Calhoun Community College | Education | Decatur, Alabama, United States | GCOP | Central chilled-water system | CUSTOMER-REPORTED RESULT | Documentation incomplete | 18% lower while GCOP was active, reported |
| Metro Services Group | Commercial services | Los Angeles, California, United States | GCOP | Proposed central chilled-water optimization | PRELIMINARY FINANCIAL MODEL | Documentation incomplete | 188,718 kWh/year |
| Plaza Carso | Shopping center | Mexico City, Mexico | GCOP | Central chilled-water system | CUSTOMER-REPORTED RESULT | Documentation incomplete | 759,168 kWh/year reported |