Customer-supplied pilot result; not independently verified in the repository.
Preparing building intelligence…
Preparing building intelligence…

Customer-supplied project information describes a June 2019 GCOP pilot at Sanborns with reported energy and financial results.
Customer-supplied pilot result; not independently verified in the repository.
Reported estimate requiring baseline and meter documentation.
Underlying cost and tariff assumptions require confirmation.
These labels describe the evidence currently available in the project. They do not elevate reported or projected information to verified performance.
The facility sought to reduce central-plant energy while retaining required chilled-water service.
Central chilled-water system. Additional capacity, controls, schedule, climate, baseline, and condition details remain subject to source documentation.
GCOP was installed to optimize the approved chilled-water operating strategy.
The supplied record reports pilot savings, annual energy savings, and ROI. The baseline, comparison period, tariff, project cost, and meter source require confirmation.
Share your equipment, operating profile, controls, and available energy data. Final eligibility and performance methodology require project-specific review.