Customer-supplied project information describes a GCOP pilot completed at Madrid’s Avenida de América bus interchange in March 2022.
Customer-supplied first-year estimate requiring supporting energy records.
Reported financial result; underlying cost and tariff assumptions require confirmation.
Financial methodology requires documentary review.
These labels describe the evidence currently available in the project. They do not elevate reported or projected information to verified performance.
A high-traffic transportation facility required chilled-water optimization compatible with continuous public operation.
Central chilled-water system. Additional capacity, controls, schedule, climate, baseline, and condition details remain subject to source documentation.
GCOP was installed to optimize approved chiller operation and support performance monitoring.
The supplied values are described as first-year energy and financial results. The baseline, project cost, tariff, and financial model require confirmation.
Share your equipment, operating profile, controls, and available energy data. Final eligibility and performance methodology require project-specific review.