Not published as a savings claim because the affected energy boundary is unresolved.
Preparing building intelligence…
Preparing building intelligence…

The original DLV website documents an October 2018 RTU-SC pilot involving 11 controls at Cinemex San Pedro in Monterrey.
Not published as a savings claim because the affected energy boundary is unresolved.
Customer-supplied scope requiring installation and commissioning records.
Authorization is not represented as completed rollout; contract value, currency basis, and deployment status require confirmation.
These labels describe the evidence currently available in the project. They do not elevate reported or projected information to verified performance.
Cinema HVAC operation combines long occupied periods, variable audience loads, humidity considerations, and distributed rooftop equipment.
Packaged rooftop HVAC units. Additional capacity, controls, schedule, climate, baseline, and condition details remain subject to source documentation.
Available materials describe RTU-SC fan-speed optimization and an evaluation-oriented pilot. Unit count, pilot site, metering, duration, and final rollout scope require confirmation.
The available project documentation reports a pilot result, but the energy boundary, comparison periods, weather, occupancy, and measurement basis require documentation.
Share your equipment, operating profile, controls, and available energy data. Final eligibility and performance methodology require project-specific review.